Skip to content
Smart Lock & Smart Patch Installation - (Featured Image)
3/10/2023

Smart Lock & Smart Patch Installation

This week we installed a SmartLock 150x400mm and a Fibreglass 150x1200mm to successfully seal off two redundant laterals that were actively infiltrating groundwater, debris and roots into a 150mm Wastewater main at a site in Plimmerton.

Over Crews Have Been Busy - (Featured Image)
3/8/2023

Our Crews Have Been Busy!

Our crews have been busy investigating, maintaining and repairing stormwater & wastewater assets across the Lower North Island recently!

General Gallery - (Featured Image)
2/2/2023

General Gallery

General Gallery of some of the historical jobs we’ve completed and some of the blocked and flooded networks we have encountered!

Information

Back To Top